VS ProjektaiMetal Solutions
Industries
Hotels & Hospitality

Reception desks, lobby installations and back-of-house metal.

From the first impression a guest sees at check-in to the staircases, balustrades and corridor hardware that show wear daily. Premium finishes (brass, copper, blackened steel, full RAL palettes) executed in our own coating line.

Reception desks, lobby installations and back-of-house metal.
What we make

Hospitality scopes we deliver.

Reception desks

Bespoke reception desks in brass, copper, blackened steel or RAL colours.

Lobby installations

Feature walls, sculptural cladding, suspended structures - architectural metalwork at scale.

Staircases

Custom stair structures with matching balustrades, hospitality-grade finishes.

Balustrades

Floor-edge and stair balustrades engineered for code in your destination country.

Room hardware

Custom room-number plates, signage hardware and corridor accents.

Signage frames

Frames for exterior and interior signage in premium finishes.

Why VS Projektai for hospitality

Premium finishes, kept on the install schedule.

Heritage finishes in-house

Brass, copper, blackened steel and full RAL Classic plus chrome and gold in our own coating line.

Phased delivery

We ship by zone or floor to fit your install crew's sequencing.

One chain for design-build

Design firms and main contractors get one quote, one drawing set, one supplier.

Code-aware

Balustrade heights and fixings engineered for the destination country's code.

Our process

Six steps from brief to delivered piece.

Clear stage-gates so you always know where your project stands.

01

Project review

We read your brief, sketches and references and respond within 1 business day.

02

Technical clarification

We clarify materials, finishes, dimensions and tolerances.

03

Drawings approval

We draft production drawings; you sign off before we cut.

04

Manufacturing

Cutting, welding and finishing at our Lentvaris facility.

05

Quality control

Each piece checked against the drawing before it leaves.

06

Packing & delivery

Crated, labeled and shipped across the EU.

Hotel FAQ

What hospitality buyers ask before they commit.

Premium finishes, phased install, code compliance and how we plug into a design-build chain.

Do you do brass, copper and blackened-steel finishes?

Yes, all in-house. Plus the full RAL Classic and Design palettes, with chrome and gold special finishes. Premium finishes do not extend the lead time because they happen in our own coating line.

How do you handle phased delivery during install?

We deliver by floor, zone or any sequence your installer needs. Confirm the install sequence at the drawings stage and we plan production around it.

Are your balustrades and stair systems code-compliant?

Yes. Rail heights, infill spacing, fixings and loads are engineered to the destination country's building code, not to the LT code by default.

Can you work with our design-build firm directly?

Yes. We typically operate as a single point of contact for the architect, the general contractor and the FF&E team. One quote, one drawing set, one supplier.

What's your typical lead time for a full lobby?

8 to 12 weeks from approved drawings for a standard lobby package. Heavy structural staircases sit at the longer end of that range. Premium finishes do not extend it.

Start a project

Let's build something great together.

Drop your drawings or just describe the project. We come back with a project review within one business day.